FOR DEPOT & FLEET OPERATORS

Depot charging that grows with your fleet

One power block, freely chosen dispensers, open software. Built in Germany from standard components by panel builders near you, serviceable by any electrician, and proven in 27,000 units in the field worldwide.

THE PATH TO AN ELECTRIFIED DEPOT

Start charging before the grid catches up

Most depot projects stall waiting on a grid connection upgrade. They do not have to. We size a first stage to the connection capacity you already have, so your vehicles start charging while the utility works through the rest.

  • eDepot Quick Check

    A kick-off workshop on your site: grid situation, use cases, charging profiles, operating model, TCO indication and funding options.

  • Pilot installation

    A standard power block configuration matched to your existing connection. Half a megawatt is enough to run real charging operations while the grid work continues.

  • Scale-up

    Grid expansion, storage and PV progress in parallel. More dispensers, more power or MCS plug into the same open architecture, with no replanning.

Modern Electric Truck Depot at Dusk

OPEN ARCHITECTURE

When the supplier goes, the spare parts go with it

Efacec and Tritium were both among the best known DC charging suppliers of the past decade, and both went through insolvency proceedings in 2024. Their operators are now sitting on installations whose spare parts, firmware and certifications depend on a single company. Proprietary power electronics plus closed software means one supplier decides the future of your depot.

The EcoG power block is built from catalogue parts instead: power modules, contactors, terminals and fuses you can order through any electrical wholesaler. AC/DC and DC/DC modules from an ecosystem of more than 100 pre-integrated components share one mounting slot and one driver model in EcoG OS, so a different manufacturer's module drops into the same space with no system change. The full design is available in E-PLAN, and several panel builders manufacture it regionally on our reference architecture.

Software sovereignty in Europe

EcoG OS is developed and operated in Germany. Data access, load management and third-party integrations run over open interfaces, so control of your installation stays in Europe and with you.

EcoG open power block architecture

ONE POWER BLOCK, MIXED USE CASES

Any vehicle, any dispenser, one power block

Trucks, vans and cars share the same yard and almost never the same charging need. A single power block of 320 to 1,280 kW feeds whichever dispensers you choose, bay by bay: MCS up to 1 MW and CCS up to 600 kW for heavy trucks, CCS up to 150 kW for vans and overnight charging, plus single and dual outlet, pantograph and ceiling-fed variants where floor space is tight.

Power then follows demand across the day. A 1.2 MW block can push 400 kW into two trucks at the evening peak and spread the same 1.2 MW across twelve charge points overnight, configured in LifeC or through your own EMS. Your existing connection capacity is used to the full instead of being sized for a worst case that never happens.

EcoG dispenser options for depots

CONTACT US

Let us take a look at your depot

Tell us which vehicles you run today and which ones arrive in the next twelve months, how long they stand in the yard, and what your connection capacity is. We will come back with a configuration and a first indication.